
At A Glance
Building 8: 21,853-square-foot addition to the manufacturing warehouse, constructing a second loading dock, a new parking lot on the north side of the property and landscaping improvements.
Building 9: 45,000-square-foot addition to the warehouse and loading dock operations on the east side of the campus. The project includes a small café with an outdoor patio on the south side of the property facing the regional trail.
ARCHITECT
UrbanWorks Architecture
DEVELOPER/OWNER
Dalquist Properties LLC
GENERAL CONTRACTOR
Greiner Construction

2021
Completion Date
1.5 acres
Size

